PXtech Case Study Video.

PXTech installation case study

Another very tight deadline project.  BCS Agency needed a case study video produced rapidly to illustrate PXtech’s Oxfam Point of Sale project.  With a loose narrative of what needed to be delivered and a deadline fixed in place by an industry event, there was a real urgency to get this project right first time and on time.

We shot this with a two man team,  in three hours,  then edited and delivered the final project 36 hours after that.   With no revisions needed delivery was a full day ahead of schedule.

A tight case study with real people,  it’s an excellent example of how we can deliver high quality real world video simply and rapidly for online or live use.